    Lost maintenance history in four public inquiries

    Each of these inquiries found causes in design, procedure, supervision or regulation. Each also found that something already known about the equipment had been written somewhere the people deciding what to do with it did not look.

    Published 6 min read8 sources

    Written for maintenance and reliability engineers · plant and operations managers · safety managers

    A research report prepared for the UK Health and Safety Executive on ageing plant defines the subject in a way that is useful here:

    “ageing is not about how old the equipment is, but is about what is known about its condition”
    Plant ageing, research report RR509 prepared for the Health and Safety Executive, 2006[1]

    On that definition, equipment whose history has been lost is further along in ageing than equipment of the same age whose history is known. The report lists the usual ways it is lost: second-hand equipment, process changes, 'changes in personnel, record keeping and other human factors', and warns that 'a lifetime's knowledge that has been built up by one person can be easily lost upon retirement'.⁠[1]

    The four inquiries

    Buncefield: a gauge that stuck fourteen times

    Oil storage depot, England · 2005 · investigation report 2011
    The record
    A tank's level gauge stuck and the tank overfilled. The vapour cloud ignited, and the fire that followed was, in the investigators' words, the largest seen in peacetime UK. The gauge had stuck 14 times in the three months since the tank came back from maintenance. That 'was not recorded on the defects log and the Operations Manager was unaware of the frequency of failure'. The shift system 'led to short-term apparent fixing of problems with no proper overview of what was going wrong and why'.⁠[2]
    Our reading
    Each time, freeing the gauge restored the reading, so the symptom went away and the defect log was skipped. The independent high-level switch, which should have stopped the overfill whatever the gauge said, was also inoperable. Protection was an engineering failure; the unrecorded pattern in the gauge was a separate, records failure.

    Texas City: work orders without failure history

    Oil refinery, United States · 2005 · investigation report 2007
    The record
    Fifteen people died when a tower overfilled during start-up. The US Chemical Safety Board found the maintenance work order system 'was primarily an accounting program that lacked crucial information about work order history, the cause of failures, and whether equipment was successfully repaired'. There was no work history at all for the tower's level transmitter for the five years before the incident.⁠[3]
    Our reading
    A system configured for cost control can hold every job and still be unable to say what failed, what the technician found or whether the repair held. The Board also found that the night shift's start-up activity had been handed over in one ambiguous log line, at a site with no shift turnover requirement.

    Piper Alpha: a relief valve removed for overhaul

    Offshore platform, North Sea · 1988 · public inquiry 1990
    The record
    The night shift set about restarting a pump without knowing its pressure safety valve had been removed for maintenance. The inquiry traced that to 'failures in the communication of information at shift handover' and in the permit-to-work system. There were no written procedures for handovers, and 'maintenance work was not always set out in the logs which were kept by operators'. Where one permit could affect another, 'reliance was placed on the memory' of the person issuing them.⁠[4]
    Our reading
    The fact that mattered was on a suspended permit in another office and in the memory of the people who had done the work. Nothing at the pump or on the operators' log said the valve was off. The inquiry's wider findings were about a permit system routinely disregarded, and about the lessons of an earlier death that had not changed practice.

    Havelock North: an earlier contamination forgotten

    Drinking-water supply, New Zealand · 2016 · Government inquiry 2017
    The record
    Thousands fell ill when bore water was contaminated. The same bores had been contaminated in 1998, and a report then had pointed to a leaking cable gland at the bore head. The inquiry found 'it appears nothing was learned from the July 1998 outbreak' and that 'memory of the earlier outbreak simply faded'.⁠[5]
    Our reading
    The 1998 report and its recommendations belonged to those bore heads. Recorded against them as open items, they would have stayed visible after the people who knew about them had moved on. The inquiry's centre was source protection and treatment, which no maintenance record replaces.

    Four places history is lost

    1. At the shift change. The HSE notes that many accidents have followed a failure of communication at shift handover, and 'the majority of these involved planned maintenance work'.⁠[6] Its review of published cases found operator logs 'were not designed to capture key information reliably and unambiguously'.⁠[7]
    2. In a fix that seemed to work. A reset, a freed gauge or a cleared trip restores operation and leaves no defect behind. At Texas City, a job order could also be closed even if the work had not been completed.⁠[3]
    3. In a system built for something else. A work-order system set up for cost control records that money was spent on a machine. Unless it is configured to, it does not record the cause, the condition found, or whether the repair held.
    4. In a person. The engineer who knew why a setpoint was changed, the operator who knew the gauge stuck. When they move on, what they knew goes with them unless it was written where the next person will look.

    What the investigators recommended

    The recommendations are practical. The Chemical Safety Board asked the refinery to:

    “Establish an equipment database that captures the history of testing, inspections, repair, and successful work order completion. Analyze repair trends and adjust maintenance and testing intervals to prevent breakdowns.”
    US Chemical Safety Board, recommendation 2005-4-I-TX-R15[3]

    The Buncefield authority concluded that 'management should have in place systems to monitor the reliability of safety critical equipment'.⁠[2] The HSE's ageing-plant guidance asks for a maintenance log 'specific to each item of equipment', able 'to differentiate between 20 new seals on one pump, and 20 new seals over several pumps', and notes that 'a brief statement of actions is normally all that is needed'.⁠[1]

    What a useful maintenance record carries

    Taken together, the findings describe a fairly modest set of things a record has to hold, most of which a technician can write in a few lines.

    • The condition found, the cause if known, and what was done. Research on Australian mobile-equipment work orders found the coded fields often missing or wrong, and the technicians' free text was what made the history usable for reliability analysis.⁠[8]
    • Whether the fix was temporary. A reset or a bypass is a legitimate response in the moment. Recorded as such, it leaves an open item; recorded as a repair, it disappears.
    • The equipment it applies to, down to the component. A gauge, a transmitter, a seal. Repeat counts only work if events are recorded against the same item.
    • Anything still open at the end of the shift. An isolation, a removed valve, a temporary override. These should stay visible on the equipment until someone closes them, rather than being re-copied from one log page to the next.

    How Mainte keeps this history on the machine is described in What the last person knew.

    Sources

    1. [1]Plant ageing: management of equipment containing hazardous fluids or pressure (RR509) · Health and Safety Executive (UK); prepared by TWI, ABB Engineering Services, SCS and Allianz Cornhill Engineering · 2006 · Research report commissioned by the regulatorQuoted from the summary and sections 2.4.2, 2.5.2 and 3.1.1. The HSE has since moved its research pages; this is the Internet Archive copy. Its contents are the authors' and not necessarily HSE policy.
    2. [2]Buncefield: Why did it happen? The underlying causes of the explosion and fire at the Buncefield oil storage depot · COMAH Competent Authority (HSE, Environment Agency, SEPA) · February 2011 · Major incident investigation reportQuoted at paragraphs 26, 54, 56 and 58. Copy hosted by IChemE; the official HSE copy is in the UK National Archives.
    3. [3]Investigation Report: Refinery Explosion and Fire, BP Texas City (Report No. 2005-04-I-TX) · US Chemical Safety and Hazard Investigation Board · March 2007 · Federal incident investigation reportQuoted at sections 1.5, 7.2.3, 7.2.4 and 10.1.1, and recommendation R15 (p. 215).
    4. [4]The Public Inquiry into the Piper Alpha Disaster, Volume 1 (Cm 1310) · The Hon. Lord Cullen, HMSO; republished by the Health and Safety Executive · November 1990 · Public inquiry reportQuoted at paragraphs 1.5, 11.4 and 11.13.
    5. [5]Report of the Havelock North Drinking Water Inquiry: Stage 1, part 1 overview · Government Inquiry into Havelock North Drinking Water, Department of Internal Affairs (NZ) · May 2017 · Government inquiry reportQuoted at paragraphs 13 and 14.
    6. [6]Human factors: shift handover · Health and Safety Executive (UK) · Current guidance · Regulator guidance
    7. [7]Effective shift handover: a literature review (OTO 96 003) · Health and Safety Executive, Offshore Safety Division (UK) · June 1996 · Regulator-published literature reviewQuoted from section 4.7. Internet Archive copy of the HSE original.
    8. [8]Cleaning historical maintenance work order data for reliability analysis · M. Hodkiewicz and M. Ho, University of Western Australia; Journal of Quality in Maintenance Engineering 22(2) · May 2016 · Peer-reviewed journal articleCited from the published abstract; data from heavy mobile equipment across several organisations.