Incident analysis
What six incident reports say about defects that were already known
In each of these six public reports, somebody had already seen the problem: on a pre-start, in a parts request, or in a procedure that said what to do if a fault came back. The reports are worth reading for what happened next.
Published 6 min read7 sources
Written for maintenance managers · safety managers · site and project directors
The sources are a NSW investigation report, three West Australian significant incident reports, two Queensland court summaries and a coronial inquest. Company and site names are left out of the text even where the sources give them, and the names of people who died are not used anywhere. Each document is linked at the end.
The six cases
The same faults recorded almost daily, then filed
NSW mine processing plant · 2021 · regulator report 2023- The record
- A worker was buried in a conveyor chute after the emergency-stop lanyard failed to stop the feeder. The investigation found pre-start checklists recording the same 'high' faults almost daily, filed without corrective action, with nothing recorded about repairs or tagging the plant out. That the lanyard was stretched was 'common knowledge'.[1]
- Our reading
- The checklist itself said a 'high' fault meant tagging the plant out of service. The procedure existed and the inspections were done; what was missing was anyone acting on the result, and any record that would show it had not been acted on.
A clearing system out of service for over a year
WA crushing plant · December 2016- The record
- A fitter was struck in the chest while a bogged cone crusher was being cleared by hand. The crusher's own hydraulic clearing system had been inoperable for more than twelve months, with seven of its twelve cylinders leaking. The repair had been planned for a shutdown and slipped when the parts were late.[2]
- Our reading
- Deferring the repair to a shutdown was a reasonable decision when it was made. It became a different decision once the shutdown passed, but nothing prompted anyone to make it again, and the manual clearing task carried the risk in the meantime.
Worn parts and repeated blockages in one shift
Queensland waste facility · 2021 · sentenced 2024- The record
- A worker died clearing a shredder on night shift. The court report records the shredder in poor mechanical condition, with most of its teeth non-operational and due for replacement, and repeated blockages through the shift. There was no documented procedure for clearing a blockage, and the only safety measure was an undocumented lock-out and tag-out. There was no supervisor on the shift.[3]
- Our reading
- The worn teeth were the reason the machine kept blocking, and the blockages were the reason someone was reaching into it. A known, open repair was driving an unplanned hazardous task, on a shift with nobody who could stop the work.
Inspections that did not find the defect
WA drill rig · 2015- The record
- A 41 kg section of walkway mesh fell 18 metres from a drill mast and landed beside the occupied cab. Worn washers and non-locking nuts were found, and the regulator concluded that inspections were inadequate. It then set out the loop it expects: a competent person assesses the defect, it is repaired as specified, and the plant is inspected and tested before it is returned to service.[4]
- Our reading
- The report also asks that inspection points be defined by a competent person, at the areas prone to wear, corrosion and fatigue. A daily walk-around will not find worn washers on a mast walkway unless someone has decided that is where to look.
Repair work without isolation or notice
Queensland manufacturer · conveyor · sentenced 2024- The record
- A worker repairing a powder-coating line was caught in its unloading conveyor and died. Sentencing, the magistrate singled out three controls the company introduced afterwards as what should have been in place: notifying someone before starting work on the conveyor, completing a maintenance log, and isolating or tagging out the equipment first.[5]
- Our reading
- Notification and the maintenance log tell the rest of the site that work is under way and what was done. Isolation is the physical control that makes the work safe. The magistrate treated all three as basic, and none of them depends on the others.
Five resets in seven days
Queensland theme-park ride · 2016 · coroner's findings 2020- The record
- Four people died when a water ride's pump failed and the conveyor kept running. In the seven days before, the ride broke down five times with the same pump-drive fault, and each time the drive was reset without a diagnosis. The written procedure said a repeat within 24 hours needed an engineering supervisor's authority. Staff were unsure whether that meant the second or the third time. The park had a maintenance system, but its planner was not told about ride breakdowns, which were logged on paper at the ride. The coroner found that 'shoddy record keeping was a significant contributor'.[6]
- Our reading
- The coroner placed the primary causes elsewhere: no water-level monitoring and no interlock to stop the conveyor when a pump failed. On the maintenance side, the park had a sensible escalation rule and a computerised system, and the breakdown record that should have triggered both was on paper at the ride.
Reporting a defect is the first of several decisions
Read together, the reports describe a sequence of decisions after a defect is found, and most of the failures happen at a particular one of them. It helps to separate them, because different people own each.
- Report. The operator or inspector records what they saw, on the machine it was seen on, and does not use the plant if the fault is critical. The processing-plant checklists show this step working.
- Classify. Someone decides how serious it is. A pre-start form can pre-classify items, as that checklist did with its 'high' faults, but the classification only matters if it changes what happens to the machine.
- Dispose. A supervisor or competent person decides between repairing now, tagging the plant out, or deferring the repair with interim controls. A deferral is a risk decision: it needs a named owner, the controls that apply in the meantime, and a date or condition at which it lapses. The crusher's deferral had a date (the shutdown) but nothing that reopened the decision when the date passed.
- Repair. The maintainer diagnoses and fixes it, and records what they found as well as what they did. A reset that clears a fault without finding its cause is not a repair; the ride's drive was reset five times.
- Verify and authorise. A competent person tests that the repair works and someone with the authority decides the plant can be used again. The drill-rig report makes this explicit. From completion to return to service goes through this step in detail.
The escalation rule in the ride's procedure is a good example of what a site can write down in advance: a repeat of the same fault within 24 hours goes to an engineering supervisor before anyone rectifies it. The rule was sound; the difficulty was counting. Nobody could say reliably whether the fault had happened twice or three times that day.
What records can and cannot do here
Better records would not have prevented these events on their own, and the reports do not suggest they would. What they can do is make each decision above visible: an open defect that has not been dispositioned, a deferral past its date, a fault on its third reset. The WA regulator's standard for isolation, 'lock, tag and try', is a physical act, and no record of it is a substitute.[7] The coroner was blunt about the limits of administrative measures in a badly designed system:
“Regardless of the training provided at [the park], it would never have been sufficient to overcome the poor design of the [ride], the lack of automation and engineering controls.”
Four questions to put to your own site
- When a pre-start records a critical fault, what happens to the machine within the hour, and who is told?
- How many defects are open today, how old is the oldest, and which of them are deferrals past their date?
- If the same fault is reset three times this week, who finds out, and how?
- Who may return a machine to service after a repair, and where is that decision written down?
The way Mainte handles the sequence from a failed pre-start to an authorised return to service is described in From a failed check to a safe return to service.
Sources
- [1]Investigation report: serious injury of a worker at Thuddungra Mine · Resources Regulator, NSW Department of Regional NSW · May 2023 · Major safety investigation reportQuoted findings: executive summary (pp. 3–4) and section 6.6 (p. 19).
- [2]Mines Safety Significant Incident Report No. 252: fitter struck in chest by packing plate released under pressure · Department of Mines and Petroleum, Western Australia (now hosted by WorkSafe WA) · 12 May 2017 · Significant incident report
- [3]Waste resource company fined $140,000 after worker fatality · Office of the Work Health and Safety Prosecutor, Queensland · Decided 19 February 2024 · Court report (summary of sentencing)
- [4]Mines Safety Significant Incident Report No. 227: grid mesh falls from drill mast · Department of Mines and Petroleum, Western Australia (now hosted by WorkSafe WA) · 6 October 2015 · Significant incident report
- [5]Aluminium production company hit with $150,000 fine after worker fatality · Office of the Work Health and Safety Prosecutor, Queensland · Decided 19 April 2024 · Court report (summary of sentencing)The report gives the date of the incident as both June 2021 and June 2022, so no year is given for it here.
- [6]Inquest into the deaths at the Thunder River Rapids Ride: findings of the coroner · Coroners Court of Queensland · 24 February 2020 · Coronial findings and recommendationsQuoted at paras 340, 352, 387, 1010, 1028 and 1035. The findings name the people who died; this page does not.
- [7]Mines Safety Significant Incident Report No. 248: worker seriously injured when caught in moving conveyor · Department of Mines and Petroleum, Western Australia (now hosted by WorkSafe WA) · 12 September 2016 · Significant incident report